Case study – The Hume Weir Dam, Albury
If you’ve flown into Albury at night time, or taken an evening drive along the Murray River crossing between Victoria and NSW, there’s no doubt you’ll have admired the stunningly lit Hume Weir Dam.
In 2002, Lecky’s won the tender to supply bulk electrical cabling and fixtures to light up the Dam’s spillway.
A technically complex job with punishing timeframes, it required purpose-designed lighting, delivered to coincide with deadlines set by other contractors handling the major physical upgrade.

In the face of tricky logistics – with many components being designed and manufactured from the ground up or imported – Lecky’s engineered a record turn-around, quoting in February 2002 and supplying less than six months later.
So next time you’re in Albury, check out how our 185 specialist light fittings, have helped to transform this basic utility into an impressive feature in the Albury landscape.
In 2002, Lecky’s won the tender to supply bulk electrical cabling and fixtures to light up the Dam’s spillway.
A technically complex job with punishing timeframes, it required purpose-designed lighting, delivered to coincide with deadlines set by other contractors handling the major physical upgrade.

In the face of tricky logistics – with many components being designed and manufactured from the ground up or imported – Lecky’s engineered a record turn-around, quoting in February 2002 and supplying less than six months later.
So next time you’re in Albury, check out how our 185 specialist light fittings, have helped to transform this basic utility into an impressive feature in the Albury landscape.